[lead]Greenways, in cooperation with the Regional District of East Kootenay (RDEK), is seeking to facilitate the establishment of a 25 kilometer multi-use, non-motorized paved trail connecting the communities of Invermere and Fairmont Hot Springs along the west side of Lake Windermere paralleling Westside Road (the “Westside Legacy Trail”).[/lead]
We are requesting qualified quotations from established organizations which have a proven track record with any and all aspects of new road/trail construction. The construction planned for 2017 will include segments 2-7*. These aspects include clearing and grubbing through to completion of the paved trail, signage, and interpretive signage as detailed on the full RFQ PDF below:
Construction RFQ
[button link=”http://ourtrail.org/wp-content/uploads/2017/03/Westside-Legacy-Trail-RFQ-March-23-2017.pdf” size=”lg” type=”primary”]DOWNLOAD CONSTRUCTION RFQ[/button] [button link=”http://ourtrail.org/wp-content/uploads/2017/03/Westside-Legacy-Trail-Workbook-March-2017.xlsx” size=”lg” type=”primary”]DOWNLOAD CONSTRUCTION BID WORKBOOK[/button] [button link=”http://ourtrail.org/wp-content/uploads/2017/03/Westside-Legacy-Trail-Drawings-March-31-2017.pdf” size=”lg” type=”primary”]DOWNLOAD CONSTRUCTION DRAWINGS[/button] [button link=”http://ourtrail.org/wp-content/uploads/2017/03/Addendum-1-RFQ-2017.pdf” size=”lg” type=”primary”]DOWNLOAD ADDENDUM 1 – MARCH 2017[/button]
Interpretive Signage RFQ
[button link=”http://ourtrail.org/wp-content/uploads/2017/03/Westside-Legacy-Trail-RFQ-Signage-March-23-2017.pdf” size=”lg” type=”primary”]DOWNLOAD INTERPRETIVE SIGNAGE RFQ[/button] [button link=”http://ourtrail.org/wp-content/uploads/2017/03/Westside-Legacy-Trail-SIGNAGE-Drawings-March-23-2017.pdf” size=”lg” type=”primary”]DOWNLOAD INTERPRETIVE SIGNAGE DRAWINGS[/button]
*Pending funding, total constructed segments in 2017 may be less.